EasyManua.ls Logo

Abbott CELL-DYN 3000 - Page 208

Abbott CELL-DYN 3000
296 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide 9140234B-June 1997
VERIFICATION PROCEDURES
VP - 6.1 Mixing Head Position Check
3 - 83
3
Search
Book TOC
Go Back
h. Mixin
g
Head should fit completely into Tool
without shifting tool or Rack
. No Play between
Tool and Mixin
g
Head. If Check Fails,
g
o to “VP - 6.2 Mixin
g
Head Position Adjustment” (Pa
g
e
3-85).
G Loader [Europe]
a. Put Loader in Manual Mode.
1.
Press and Hold
MAN
and
START
.
2.
Turn Power
ON
, hold keys down until BEEPING stops.
b. Move X-Axis Solenoids to Left End Stop.
c. Insert Rack Guide Ali
g
nment Tool in Ri
g
ht End of Platen (Fi
g
ure 3-38).
d. Load Sarstedt Tube in Position # 4 of Rack and Place Rack on Left End of Platen (Fi
g
ure
3-40).
e. Press (
X
) to move Rack into cutout. Tube should be under Mixin
g
Paddle (Fi
g
ure 3-38).
f. Press (
Z
) to lower Mixin
g
Head onto Tube.
g
. Check Ali
g
nment of Tube.
1.
Press and hold (
R
) to Rotate Tube.
2.
Verify Tube is Centered in Rack while rotatin
g
(Fi
g
ure 3-40).
3.
If Check Fails,
g
o to “VP - 6.2 Mixin
g
Head Position Adjustment” (Pa
g
e 3-85).
4.
If Check is OK,
g
o to “VP - 6.3 Mixin
g
Home Sensor Check/Adjustment” (Pa
g
e 3-89).

Table of Contents

Other manuals for Abbott CELL-DYN 3000

Related product manuals