EasyManua.ls Logo

Siemens HiPath 1120 - Examples of Configurations X Capacities X Times; Main Distribution Frame; Table 3-36 Examples of the Working Period of the Batteries in the Hipath 1150; Table 3-37 Examples of the Working Period of the Batteries in the Hipath 1190

Siemens HiPath 1120
389 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Modules
3-100 Service Manual
Main Distribution Frame
3.8.1 Examples of Configurations X Capacities x Times
As an example, a simulation was carried out in some of the settings of the HiPath 1150/1190
systems for the working period of the system when there is in an outage in the AC network
under normal call traffic conditions.
HiPath 1150
Table 3-36 Examples of the working period of the batteries in the HiPath 1150
Increasing by one EB 210 module reduces the total time by 15 minutes.
HiPath 1190
Table 3-37 Examples of the working period of the batteries in the HiPath 1190
Increasing by one EB 210 module reduces the total time by 15 minutes. If the working period
is less than 1.5 hours, this falls by 5 minutes.
3.9 Main Distribution Frame
Introduction
The Main Distribution Frame (MDF) connects cabling to a public exchange and extensions
using Connectors.
Follow the procedures described in Chapter 4.9, “Connections to the system’s MDF” on page
4-170 to attach the cables to the MDF Connectors.
All Connectors required for attaching the cables are provided with the modules and systems.
Settings Battery capacity Working period
01 MB 7Ah 14 hours
01 MB + 01TME1 7Ah 10 hours
01 MB + 01 EB 210 7Ah 11 hours
Settings Battery capacity Working period
01 CPU + 01 EB 210 7Ah 11 hours
01 CPU + 01 EB 210 + 01TME1 7Ah 9 hours
01 CPU + 02 EB 210 + 02TME1 7Ah 4 hours

Table of Contents

Other manuals for Siemens HiPath 1120

Related product manuals