EasyManua.ls Logo

Hioki 8423 - 6.1 Pre-Operation Inspection

Hioki 8423
266 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.7 Setting Environment Conditions
126
This section describes setting the action to perform after the power supply is
restored when there was a power cut (power outage) during recording. This set-
ting is only enabled during standalone measurement.
5.7.4 Start Backup
Selectable
Items
Explanations
OFF Stop measurement when there is a power cut.
ON
When the power supply is restored, the instrument enters the restart
state and starts the recording operation. (Previous measurement data is
discarded from the memory of the instrument.) If a trigger is being used,
the instrument enters the trigger wait state.
Even when the start backup function is ON, if the logger was being controlled by
Logger Utility when the power outage occurred, the instrument will resume mea-
surement but Logger Utility will not be able to resume measurement.

Table of Contents

Related product manuals