12E5119 Instruction Manual QuickTOC
®
ultra
IECEx 171
8 Care and Maintenance
8.4 Care Actions
LAR | PROCESS ANALYSERS AG
8.4 Care Actions
Use the following protocol to document the care measures.
:
Table 19: Care Action Protocoll
Notice
A corresponding copy template of the protocol can be found in Chapter 13 on
page 265.
The careful documentation is precondition for any guarantee and warranty
claims.
Action Done Comment
Interval: If necessary
Rinse the injection system
Clean glass components
Fill canisters
Clean canisters
Clean supply tubes
Cleaninlet and drain tubes
Clean Teflon tube (reactor foot)
Clean reactor foot
Clean injection tube
Adjust sample pump
Clean Viton tube
Clean injection needle
Renew calibration standard
Interval: 1 Month
Clean needle guide (injection port)
Interval: 3 Months
Check the furnace system
Check the gas cooling pipes
Clean and oil injection port
Move pump tubes (tube cassette pump)
Check the mechanical backlash of the XY-System
Interval: 6 Months
Check the injection port
Date: Signature
i