5 Start-up
5.4 Remove Transportation Locks
LAR | PROCESS ANALYSERS AG
5.4.2 Transport lock of the XY-System
The XY system is secured with a cable tie for transportation, which must be removed for operation of the
analyser.
Proceed as follows:
1. Remove the cable tie (1) of the XY-System with side-cutting pliers.
2. Check for moveability of the needle gallows (2).
Fig. 37: Removing the cable tie
Warning
Warning of damage
Ensure not to damage any cables, tubes or the XY system with the pliers.
1
2
!