12E5119 Instruction Manual QuickTOC
®
ultra
IECEx 59
5 Start-up
5.2 Checking the Pre-Fusing
LAR | PROCESS ANALYSERS AG
5.2 Checking the Pre-Fusing
Before start-up can begin, it is important to ensure that correct pre-fusing has been installed at the op-
erator.
5.3 Checking the Installation Plate
Before start-up can be performed, it is important to ensure that no components have become loose or
suffered damage during transit. The housing and the components on the installation plate in the rear part
of the housing (Fig. 25, page 36) must also be checked.
5.4 Remove Transportation Locks
Transport locks are affixed to safeguard the analyser and its components during transport. They must
be removed before the analyser is used.
Table 8: Start-up protocol for options
Task Criteria OK Comment
Start-Up of the
Reagent Cabinet
Connection to Analyser is made
Start-Up of the
FlowSampler
®
FlowSampler
®
is connected with
Analyser
FlowSampler
®
is connected with
process
Date: Signature:
Notice
Careful documentation is a precondition for any guarantee and warranty
claims.
If you have any question, please contact your local partner or the Technical Sup-
port of LAR (Chapter 15 on page 283).
Notice
Measurement mode of the analyser must be checked to ensure perfect operation of
the analyser. This may mean start-up can take up to two days.
i
i