12E5119 Instruction Manual QuickTOC
®
ultra
IECEx 73
5 Start-up
5.14 Switch On the Analyser
LAR | PROCESS ANALYSERS AG
Fig. 51: Emergeny cooling connection (Example)
5.14 Switch On the Analyser
The analyser is switched on for the first time by Technical Support of LAR or by a person authorised by
LAR.
Preconditions:
• Completion of all installation steps (Chapter 4 from page 45)
• Removal of transport locks (Chapter 5.4 from page 59)
• Switch-on of internal fuses (Chapter 5.6 on page 62)
• Filling and installation of the reactor pipe (Chapter 5.7 from page 63)
1. Before the measuring mode is started, the control unit produces the pressurized enclosure.
2. Close the analyser (if it previously was open).
Warning
Warning of warranty void
The warranty of the analyser may be void if the analyser has been improperly
installed prior to initial use!
Turn on the analyser after proper installation by a person authorized by LAR.
Notice
Fault message “E1820 - Furnace temperature not reached” is shown when the system
is switched on. This message disappears once the furnace has reached the required
temperature. It does not need to be confirmed in the log book.
1
!
i