12E5119 Instruction Manual QuickTOC
®
ultra
IECEx 63
5 Start-up
5.7 Reactor Pipe Filling and Installation
LAR | PROCESS ANALYSERS AG
5.7 Reactor Pipe Filling and Installation
Some components of the furnace system are packed individually for safety during transit. These com-
ponents must be fitted in the furnace.
Remove the following components from the packaging:
• Reactor Pipe
• Protective Pipe
• Ceramic Sieve
• Ceramic Balls
• Green Protective Seal
Assembly of the ceramic reactor pipe in the furnace::
Warning
Warning of damage to the analyser
The analyser may suffer irreparable damage if operated with an unfilled reac-
tor pipe or without a reactor pipe.
Fill the reactor pipe and install the reactor pipe in the furnace before operating
the analyser.
Fig. 39: Reactor pipe filling (Standard)
!
1. Reactor Pipe
2. Protective Pipe (Ceramic)
3. Ceramic Balls 1.6mm
4. Ceramic Balls 3.5 - 4.5mm
5. Ceramic Sieve