EasyManua.ls Logo

Oce ColorStream - Page 174

Oce ColorStream
524 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Proceed as follows:
Push the brake bracket down-
wards.
7.
Caution
Observe height and alignment of the hoisting lift
The hoisting lift mandrel must be carefully inserted up to the stop point.
Unlock the hoisting lift and push
the hoisting lift mandrel careful-
ly into the notch below the devel-
oper station to the stop point.
If the hoisting lift mandrel does
not slide easily into the notch,
correct the height and/or align-
ment of the hoisting lift.
8.
Lock the hoisting lift.
Pull the maintenance cart to
check that it is properly secured,
and correct if necessary.
9.
Chapter 6 - Operating the Printing System174
Removing the developer station

Table of Contents

Related product manuals