[scaddios-140213-01.tif, 1, en_US]
Figure 9-12 Adding Additional Input/Output Modules
[scroutin-210415, 1, en_US]
Figure 9-13 Assignment of the Current and Voltage Inputs of the Added Input/Output Modules on Meas-
uring Points
The maximum numbers of measuring points that can be routed for one PMU are:
•
2 x 3-phase voltage measuring points
•
2 x 3-phase current measuring points
•
2 x 1-phase voltage measuring points
•
2 x 1-phase current measuring points
You can assign all supported measuring points to any PMU, see the following figure. However, each PMU must
be connected to a 3-phase voltage measuring point.
Measured Values, Energy Values, and Supervision of the Primary System
9.5 Phasor Measurement Unit (PMU)
1012 SIPROTEC 5, High-Voltage Bay Controller, Manual
C53000-G5040-C015-9, Edition 11.2017