EasyManua.ls Logo

Siemens 6MD86 - Page 201

Siemens 6MD86
1256 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
[scVI1ph_V1ph, 1, en_US]
Figure 5-8 Connecting Measuring Points to the Voltage-Current 1-Phase Function Group
If you select the voltage type VN broken-delta for the 1-phase voltage measuring point in the measuring
point routing (see the following figure), the device measures the residual voltage V
N
at the broken-delta
winding. The residual voltage is converted into the voltage equivalent of the zero-sequence voltage. This
converted voltage is used as the voltage input for all functions in the Voltage-current 1-phase function
group.
[scvnopen, 1, en_US]
Figure 5-9 Selection of the VN broken-delta Voltage Type for the 1-Phase Voltage Measuring Point
The zero-sequence voltage calculated from the 3-phase voltage system or the measured residual voltage is
available via the voltage interface (see figure below).
[scVI1ph_V3ph, 1, en_US]
Figure 5-10 Connecting Measuring Points 3-Phase Voltage and 1-Phase Current to the 1-Phase Voltage-
Current Function Group
You can connect the voltage interface of the Voltage-current 1-phase function group with precisely one 3-
phase voltage measuring point. 3 types of 3-phase voltage measuring-point connection are supported. With
the different connection types, the type of voltage input for the functions in the Voltage-current 1-phase
function group also changes.
Function-Group Types
5.3 Function-Group Type Voltage/current 1-Phase
SIPROTEC 5, High-Voltage Bay Controller, Manual 201
C53000-G5040-C015-9, Edition 11.2017

Table of Contents

Other manuals for Siemens 6MD86

Related product manuals