EasyManua.ls Logo

ICON A5 - Page 651

ICON A5
836 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PROPULSION / ENGINE 16-27
CHANGE C2 ICON A5 / MAINTENANCE MANUAL
CHAPTER 16
TASK INSTRUCTIONS:
1. All line maintenance tasks for the engine must be performed in accordance with the current
Rotax 912 iS Sport (912 iS 2) Line Maintenance Manual.
Some line maintenance tasks may require the removal of the engine cowling to gain access, e.g.
remove and change spark plugs.
VERIFICATION METHOD:
See Rotax 912iS Line Maintenance Manual for verification methods.
RELATED INFORMATION:
"Interval Maintenance—Operational Hours" on page 3-4
"Interval Maintenance—Calendar Intervals" on page 3-5
"Remove Engine Cowlings" on page 16-13
"Install Engine Cowlings" on page 16-16
"Remove Oil Tank" on page 16-72
"Install Oil Tank" on page 16-76
16.1.4.6 Engine Mount Removal
Use the following procedure to remove the engine mount.
TASK INFORMATION:
Type of Maintenance
Heavy
Level of Certification
LSA-RM
Task Specific Training Required
No
Special Tools Required
None
Parts Required
None
Aircraft System and Number
13—Propulsion
Consumables
None

Table of Contents

Other manuals for ICON A5