EasyManuals Logo

Juniper MX2020 Hardware Guide

Juniper MX2020
800 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #642 background imageLoading...
Page #642 background image
3. Grasp the extended DC cable manager, lift up and pull straight out from the DC PDM on the rear of
the chassis.
4. Place the extended DC cable manager into an electrostatic bag and set it aside.
Figure 277: Removing the Extended DC Cable Manager
D
g000033
Installing the MX2020 Upper Extended Cable Manager
The upper extended cable manager should be used with the extended craft interface to allow for additional
clearance.
To install the upper extended cable manager (see Figure 278 on page 627):
1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to
one of the ESD points on the chassis.
2. If necessary, remove the extended craft interface as described in “Removing an MX2020 Extended
Craft Interface” on page 584.
3. Position the upper extended cable manager on the studs below the location of the craft interface.
4. Attach the upper extended cable manager using eight screws as shown in Figure 278 on page 627.
5. Replace the cable manager cover, and secure it with the two captive screws.
6. Install the extended craft interface as described in “Installing an MX2020 Extended Craft Interface” on
page 585.
626

Table of Contents

Other manuals for Juniper MX2020

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Juniper MX2020 and is the answer not in the manual?

Juniper MX2020 Specifications

General IconGeneral
BrandJuniper
ModelMX2020
CategoryNetwork Router
LanguageEnglish

Related product manuals