EasyManuals Logo

Juniper MX2020 Hardware Guide

Juniper MX2020
800 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #146 background imageLoading...
Page #146 background image
Review the maximum distance allowed for each cable. Choose the length of cable based on the
distance between the hardware components being connected. See:
Calculating Power Budget and Power Margin for Fiber-Optic Cables on page 149
Understanding Fiber-Optic Cable Signal Loss, Attenuation, and Dispersion on page 151
10. Plan the cable routing and management. See:
MX2020 Cable Management Description on page 37
Maintaining Cables That Connect to MX2020 MPCs or MICs on page 529
RELATED DOCUMENTATION
MX2020 Universal Edge Router Overview | 3
MX2020 Site Preparation Checklist
The checklist in Table 35 on page 123 summarizes the tasks you must perform when preparing a site for
router installation.
Table 35: MX2020 Site Preparation Checklist
DatePerformed ByFor More InformationItem or Task
Environment
“MX2020 Router Environmental
Specifications” on page 137
Verify that environmental
factors such as temperature
and humidity do not exceed
router tolerances.
Power
“MX2020 DC Power
Distribution Module (-48 V)
Description” on page 107
“MX2000 DC Power
Distribution Module (240 V
China) Description” on page 109
Measure distance between
external power sources and
router installation site.
123

Table of Contents

Other manuals for Juniper MX2020

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Juniper MX2020 and is the answer not in the manual?

Juniper MX2020 Specifications

General IconGeneral
BrandJuniper
ModelMX2020
CategoryNetwork Router
LanguageEnglish

Related product manuals