[sc_para_dev_set, 1, en_US]
Figure 6-144 IEC 61850 Structure Settings
For using Port J for the GOOSE communication:
•
Activate the device functionality for Port J.
[sc_para_dev_func, 1, en_US]
Figure 6-145 Setting for the Integrated Ethernet Interface
•
Instantiate the voltage controller function for the two-winding transformer and the Parallel control
function and the proxies that are necessary for parallel operation. One ParallelProxy is required for
each transformer to be controlled in parallel, that is, for 3 transformers in the project, it must be addition-
ally instantiate 2 ParallelProxies.
Control Functions
6.9 Voltage Controller
SIPROTEC 5, High-Voltage Bay Controller, Manual 477
C53000-G5040-C015-9, Edition 11.2017