EasyManua.ls Logo

Siemens Rapidlab 1200 - Testing for Leaks; Yearly Maintenance

Siemens Rapidlab 1200
448 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rapidlab 1200 Operator’s Guide: Maintenance 5-11
02087462 Rev. V
c. Disconnect the tubing from the connector at the pressure sensor bubbler.
5. Connect the new tubing:
a. Connect the new tubing to the spring-loaded latch.
b. Push the new tubing into the pinch valve.
Center the tubing and ensure the tubing does not have any sharp bends.
c. Connect the new tubing to the pressure sensor bubbler.
6. Close the measurement module door.
7. Select
No.
8. Reinstall the reagent cartridge and close the reagent cartridge door.
9. Close the front cover.
10. Dispose of the tubing according to your institution’s protocol.
Testing for Leaks
1. To ensure that the tubing has been properly reinstalled, perform the Leak Test.
Refer to Performing the Leak Test‚ page 6-37.
2. Select
Return > Analyze > Yes.
Yearly Maintenance
Yearly maintenance includes the following tasks:
Replacing the measurement module tubing and pressure sensor bubbler
Replacing the CO-ox tubing
Replacing the reagent manifold
Replacing the AutomaticQC manifold
Replacing the air filters

Table of Contents

Related product manuals