EasyManua.ls Logo

Siemens Rapidlab 1200 - Reinstalling the Sensors; Completing the Inspection Procedure

Siemens Rapidlab 1200
448 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6-30 Rapidlab 1200 Operator’s Guide: Troubleshooting
02087462 Rev. V
b. Push the clot-removal line through the fluid connector on the reagent manifold
until the clot-removal line appears again.
Figure 6-14 Rapidlab 1200 Systems Sample Path
Reinstalling the Sensors
1. Dry each sensor, ensure that the O-rings are in place, and then reinstall each sensor.
2. Connect the pinch valve tubing to the latch and the reagent manifold.
3. Press the tab on the spring-loaded latch to release the latch.
4. Close the measurement module door.
Completing the Inspection Procedure
1. Reinstall the cartridges and close the reagent and wash doors.
2. Perform the RCx reagent flow test:
a. Select
Return.
b. Select
Fluidic Functions > RCx.
c. Look at the sample path for obstructions and flow problems.
3. Select
Wash Cycle.
4. Select
Return.
5. Select
Analyze > Yes.
6. Verify sensor performance by analyzing a minimum of 2 levels of quality control
material.
1 Fluid connector

Table of Contents

Related product manuals