90
Compatible SCPI Commands
Supported SCPI Commands
This command is accepted, but takes no action and reports no error.
CALCulate<1|2>:MARKer<1...4>:MAXimum[:PEAK]
Places the delta marker at the current maximum on the measured curve. If required, the delta marker is
first activated.
This command is an event, and therefore has no *RST value and no query.
CALCulate<1|2>:MARKer<1...4>:MAXimum:NEXT
Places the marker at the next smaller maximum value of the corresponding trace.
CALCulate<1|2>:MARKer<1...4>:MAXimum:LEFT
Places the marker at the next smaller maximum to the left of the current value (that is, in order of
decreasing X values) on the trace.
CALCulate<1|2>:MARKer<1...4>:MAXimum:RIGHt
Places the delta marker at the next smaller maximum to the right of the current value (that is, in order of
increasing X values). If required, the corresponding delta marker is first activated.
Remote Command :CALCulate[1]:MARKer[1]|2|3|4:Y:PERCent <float>
:CALCulate[1]:MARKer[1]|2|3|4:Y:PERCent?
Example CALC:MARK2:Y:PERC 95PCT
Remote Command Notes FSP, FSU
Min 0
Max 100
Remote Command :CALCulate[1]:MARKer[1]|2|3|4:MAXimum[:PEAK]
Example CALC:MARK:MAX
Remote Command Notes FSE, FSP, FSU
Remote Command :CALCulate[1]:MARKer[1]|2|3|4:MAXimum:NEXT
Example CALC:MARK:MAX:NEXT
Remote Command Notes FSE, FSP, FSU
Remote Command :CALCulate[1]:MARKer[1]|2|3|4:MAXimum:LEFT
Example CALC:MARK:MAX:LEFT
Remote Command Notes FSE, FSP, FSU