2N8/2N7
1-5-84
3. Remove six screws.
4. Remove the engine PWB.
5. Check or replace the engine PWB and
refit all the removed parts.
*: When replacing the engine PWB,
remove the EEPROM (U100) from the
engine PWB and then reattach it to the
new engine PWB.
Figure 1-5-133
U100
EEPROM
(U100)
Screws
Engine PWB
Engine PWB
Screws
Screws