Initial System Startup
Follow this procedure for initial (first-time) startup and testing of the system.
Initial startup includes:
Calibrating the level sensor
Flushing the system (melter, hoses, and applicators)
Testing the system operation
To calibrate the level sensor
CAUTION! This procedure applies only to the initial calibration of the hot melt
system, before any adhesive has been added. Refer to Calibrating the Level
Sensor in Section 7, Troubleshooting, for the correct calibration procedure
for all other calibration situations.
1.. Switch the melter on. The Home screen appears.
2.. Make sure the pump is Off. Touch Pump > Pump Control and observe
the Pump Control button to determine the On/Off status of the pump.
Grid
175C
Manifold
175C
Zone 1B
175C
Zone 2B
175C
Zone 3B
175C
Zone 4B
175C
Zone 1A
175C
Zone 2A
175C
Zone 3A
175C
Zone 4A
175C
Master
Controls
Pump: On
Heaters: On
Password: Disabled
Recipes:
Nothing Loaded
Fill Status
Pump
Ready
System Status:
Ready/OK
Purge
Auto Pump
OffPump: Off
Done
Pump Control
Pump
Ready
Figure 4‐31 Accessing the Pump screen