Installation
3-54
Part 1123087_02
3/2014 Nordson Corporation
Control System Setup and Initial System Startup
Continue to the next section, Setup, to:
Set up the control system parameters for your operation
Perform the initial (first-time) system startup procedure
In particular, make sure you have entered the correct temperature setpoints
for the heated zones before you perform the initial system startup procedure,
which includes the initial calibration of the level sensor.