Repair
8-28
Part 1123087_02
3/2014 Nordson Corporation
To remove the tilt switch (contd)
4. Use the supplied pin removal tool (P/N100586) to remove the tilt switch
pins from the bulkhead harness connector. See Figure8‐17 to determine
which pins to remove.
5. Cut the pin ends and the tilt switch ends of the wires. Discard the old
pins, tilt switch components, and screws.
1
2
3
6
5
4
7
8
9
10
11
12
13
14
15
16
17
18
MANIFOLD THERMOSTAT
GRID THERMOSTAT
GRID HEATER
GRID RTD
MANIFOLD RTD
MANIFOLD HEATER
TILT SWITCH
POSITION WIRE
GRID RTD
MANIFOLD RTD
TILT SWITCH
PUMP SOLENOID +
MANIFOLD GROUND
GRID GROUND
BHR X1
NOT USED
GRID HEATER
NOT USED
MANIFOLD HEATER
PUMP SOLENOID -
Figure 8‐17 Bulkhead harness connector pin positions
To install the tilt switch
1. Insert the new tilt switch pins in the bulkhead harness connector and use
the supplied cable ties to secure the tilt switch wires to the harness.
2. See Figure 8‐16. Use the supplied screws to secure the new tilt switch
actuator and harness to the melter chassis and top pump bracket.
3. Plug the bulkhead harness connector into the BHRX1 connection.
4. Reinstall the hydraulics cover and restore the system to normal
operation.