EasyManua.ls Logo

Nordson freedom - To install the touchscreen assembly

Nordson freedom
402 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Repair
8-32
Part 1123087_02
3/2014 Nordson Corporation
To install the touchscreen assembly
See Figure 8‐19.
1. Use the two screws (1) removed previously to loosely attach the
replacement touchscreen assembly to the melter chassis.
2. Reconnect all of the power and control cables to the replacement
touchscreen assembly.
3. Connect the touchscreen assembly ground wire to the ground
connection(2) on the melter chassis.
4. Close the touchscreen assembly as follows:
a.. Lift the assembly up, push it back towards the chassis, and then let it
drop onto the pins.
b.. Tighten the touchscreen assembly screws (1).
5. Reinstall the controls cover and restore the system to normal operation.
1
2
Figure 8‐19 Replacing the touchscreen assembly
1. Touchscreen assembly screws 2. Ground wire connection

Table of Contents

Related product manuals