Installation 3-1
3 Installation
3.1 Overview
This section describes installation procedures for the Spectrum S2-900 Series Dispensing System and
covers the following topics:
Uncrating and Placing the Dispensing System
Installing the Light Beacon
Unpacking the Dispensing Chamber
Installing the Laptop Computer
Leveling the Dispensing System
Anchoring the Dispensing System
Setting Up the Service Station
Connecting the Power and Air Supply
3.2 Safety First
Operation of your S2-900 Series Dispensing System involves heat, air pressure, electrical power,
mechanical devices, and the use of hazardous materials. It is essential that every person servicing or
operating the dispensing system fully understands all hazards, risks, and safety precautions. Refer to
Section 2 - Safety for additional information.
WARNING! Installation procedures should only be performed by a trained service technician.
3.3 Facility Requirements
To ensure optimal performance and safety, it is necessary to install the dispensing system in a facility that
meets the requirements. If you have any questions about facility requirements, please contact Nordson
AYSMTEK Technical Support. See 9.2 Facility Requirements for detailed information.
3.4 Tools and Materials Needed
3 mm hex key
1/2-inch wrench
9
16-inch wrench
Phillips Screwdriver (included in tool kit)
Band Cutter
1 ½-inch wrench (included in tool kit)
Personal Protective Equipment
Diagonal-cut pliers
Hammer
Forklift
Flat Bar
Box Level