Proceed as follows:
Carefully slide the hoisting lift
mandrel as far as it will go into
the notch below the developer
station.
If the hoisting lift mandrel does
not slide easily into the notch,
correct the height and/or align-
ment of the hoisting lift.
3.
Lock the hoisting lift.
Pull the maintenance cart to
check that it is properly secured,
and correct if necessary.
4.
Pull the developer station on to
the hoisting lift up to the stop
point. The developer station au-
dibly snaps into place.
5.
Chapter 6 - Operating the Printing System 185
Removing the Developer Station from the Developer Station Shelf