EasyManua.ls Logo

Oce ColorStream - Page 191

Oce ColorStream
524 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Proceed as follows:
Unlock the hoisting lift and push
the hoisting lift mandrel careful-
ly into the notch below the devel-
oper station to the stop point.
If the hoisting lift mandrel does
not slide easily into the notch,
correct the height and/or align-
ment of the hoisting lift.
3.
Lock the hoisting lift and check
that it is properly secured by
pulling the replacement cart.
4.
Caution
Insert the developer station carefully
To prevent damage, slide the developer station carefully and evenly into the
print module up to the stop point.
Pull the locking bolt and push
the developer station carefully
and evenly into the print module
up to the stop point.
5.
Chapter 6 - Operating the Printing System 191
Installing the developer station

Table of Contents

Related product manuals