EasyManua.ls Logo

Telecor VS1 - Page 166

Telecor VS1
281 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
VS1 Installation, Configuration & Operating Guide 155
The Scheduled Event is added to the list box above. The VS1 System puts Scheduled Events
in order of the time of day they run. This helps you keep track of the events you have running
during any period of time.
Note Do not schedule multiple events to run at the same time during a day. Doing so might
cause a Command Script to not run, and you cannot control which one will run first.
Note Whenever the VS1 System is reset, the last Scheduled Event to run prior to the reset is
run again. For example, if you schedule a system reset at 4:00 a.m., the system looks at
the last Scheduled Event to run prior to 4:00 a.m. and then runs that event. For this
reason, by default, the Night configuration is scheduled to run at 12:02 a.m. every day,
one minute after the SMDR data is backed up. In case of a reset, this prevents the SMDR
data from being backed up again and overwriting what data was collected for the day.

Table of Contents