EasyManua.ls Logo

Chery QQ - Auxiliary Materials; Chapter 1 Reading Instruction; Operating Sequence and Structure Diagram; Reading Method of Maintenance Instruction

Chery QQ
635 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chery QQ Service Manual Mechanical Part of SQR 472Engine
3
Chapter 1. Reading Instruction
1) Reading Method of Maintenance Instruction
.1 Auxiliary Materials
If it is required in the operation instruction to prepare the auxiliary materials such as special tools, tools, measuring
instruments and grease in advance, you should list all auxiliary materials required in a table before carrying out each
operation.
Since the ordinary tools, lifter and spare parts are conventional materials used in the maintenance, they are omitted
here.
.2 Operating Sequence and Structure Diagram
(1) The diagram of structure and components, name of components and installation status are set forth at the
beginning of each chapter or section.
(2) The number in the figure refers to the disassembly sequence of each component. The components which may not
be reused and the tightening torque are indicated in the figure.
Seal Ring
Engine Oil Pump Cover Sheet
Engine Oil Pump Outer Rotor
Engine Oil Pump Inner Rotor
Cotter Pin
Oil Drain Valve Spring Seat
Oil Drain Valve Spring
Slide Block
Crankshaft Front Oil Seal
Engine Oil Pump Housing
1 .3 Content Omitted in this Manual
The following operating procedures have been omitted in this Manual, and they should be carried out in the actual
operation:
(1) Operation relating to the lifter and the small-sized elevator;
(2) Cleaning and wipping of common components;
(3) Relevant visual inspection.
: C omponents which may
not be reused
Unit: N·m(kg·cm)

Table of Contents

Related product manuals