EasyManua.ls Logo

Chery QQ - Operating Method for Recovery Device; Installation of Air-Conditioning System; Preparation before Installation

Chery QQ
635 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chery QQ Service Manual
II. Operating method for recovery device
1. The manifold pressure meter set is installed on the spare valve.
2. Refrigerant is recovered from the refrigerating device.
(1) The middle hose is connected to recovery device.
(2) To operate recovery device.
(3) To open the manual high pressure and low pressure valves on the manifole pressure meter set.
3. Stop recovery device after recovery is finished.
4. The manifold pressure meter set is disassembled from the spare valve.
Section 6 Installation of Air-conditioning System
I. Preparation before installation
The following items should be checked and adjusted before installation:
1engine ignition timing
2engine cooling system
3accumulator electrolyte and charging system
4carriage seal
5fuel system
6general conditions of vehicle
Chery Automobile Co.,Ltd
136

Table of Contents

Related product manuals