AH500 Hardware and Operation Manual 
11-46 
11.2.2.6  Downloading the Parameters Related to an Ether Link 
After the parameters related to an Ether Link are set, users have to download the parameters to PLCs. The 
PLCs can perform data exchange after the parameters are downloaded. 
 
Single node 
Only the data demanding setting related to the PLC selected, the start mode of the PLC selected, and the 
start modes of the modules connected to the PLC are downloaded. Before the users download the related 
parameters, they have to make sure that the system connects to the PLC normally, and they have 
completed the communication setting in NWCONFIG. Please refer to section 20.1.3 from ISPSoft User 
Manual for more information. 
 
 
Method 1 
Select a data demanding node, and then click 
  on the toolbar. The users can also download the 
related parameters by selecting a data demanding node, clicking the PLC menu, pointing to Transfer, 
and clicking Download (Single PLC).   
 
 
 
 
Method 2 
Select a data demanding node, right-click the data demanding node, and click Download (Single 
PLC) on the context menu.