Chapter 11  Convenient Functions 
11-55 
11.2.2.10  Starting/Stopping the Execution of an Ether Link Online 
If the start mode of a node is SM Flag, users can make the node start or stop the execution of the Ether Link 
constructed by means of controlling the state of the related flag when the node is monitored online. If the node 
is not monitored online, the users can not make the node start or stop the execution of the Ether Link 
constructed by means of controlling the state of the related flag. 
Users can make a single node/multiple nodes start or stop the execution of the Ether Link constructed. The 
conditions for making a single node/multiple nodes start or stop the execution of the Ether Link constructed are 
the same as the conditions for enabling/disabling the function of monitoring a single node/multiple nodes online. 
Please refer to section 11.2.2.9 for more information.   
 
A.  Starting the Execution of an Ether Link 
  Making a single node start the execution of an Ether Link 
  Method 1 
If users want to make a node start the execution of the Ether Link constructed, they have to select 
the node, and click 
  on the toolbar. They can also make the node start the execution of the 
Ether Link constructed by selecting the node, clicking the PLC menu, pointing to Flag Control, 
and clicking Start Ether Link (Single PLC). 
 
 
 
  Method 2 
Select a node, right-click the node, and click Start Ether Link (Single PLC) on the context menu.