1.5 Interrupting/terminating operation
During breaks in paving (e.g. delay due to material trucks)
- Determine the approximate duration.
- Run the vehicle empty if it is anticipated that the material will cool below the mini-
mum paving temperature.
- Set the drive lever (13) to the centre position.
During longer interruptions (e.g. lunch break)
- Set the drive lever (13) to the centre position and the speed adjuster (15)
to minimum.
- Stop engine (12) and switch ignition (11) off.