F 100 8
After the work session
- Before the last truck:
- Use the spray lance to apply separator emulsion to the hopper and conveyor side
shields (A).
- Use the spraying system to apply separator emulsion to the emptied
conveyor
belt.
- After the end of the construction site:
- Remove any remaining asphalt adhering to the conveyor side shields (A)
- Remove any remaining asphalt adhering to the scraper (B)
(still in working position).
- Remove any material adhering to the conveyor chain.