D 41 33
When work is finished
- Run the vehicle empty and stop it.
- Set the drive lever (13) to the centre position and the speed adjuster (15)
to minimum.
- Swivel the slewing conveyor belt (o) in to the centre position (45)/(46)
- Use buttons (34)/(35) to close the hopper.
- Lower the operator's platform using button (25) if necessary.
- Stop engine (12) and switch ignition (11) off.
- Remove any accessories that have been used and stow them in the storage boxes,
close flaps.
- Remove or secure all projecting parts if the vehicle is to be transported over public
roads on a low-loader.
- Read and check the operating hour counter to determine whether maintenance
work must be performed (see chapter F).
- Cover and lock the operating panel.
- Remove material residues from the vehicle and spray all parts with separator fluid.
Caution! Possible damage to the engine electronics
- After the drive engine is switched off, the on-board volt-
age may not be switched off until after a period of > 100
seconds (main switch).
Always observe the operating instructions!