EasyManua.ls Logo

GE LOGIQ P9

GE LOGIQ P9
602 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GEDRAFT LOGIQ P9/P7
D
IRECTION 5604324, REVISION 11 DRAFT (JANUARY 24, 2019) SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-123
Section 8-21
Replacement of Link Arm Cable Hook
8-21-1 Manpower
1 Person, 10 minutes.
8-21-2 Tools
Standard Phillips Screwdriver.
8-21-3 Removal Procedure
1) Remove 1 screw and remove the Link Arm Top Cover as following figure.
Figure 8-145 Removal of Link Arm Top Cover.
2) Remove 2 screws. Refer to following figure.
Figure 8-146 screw points of Link Arm Cable Hook
8-21-4 Installation Procedure
Parts to be installed in reverse order of removal.
8-21-5 Functional Check
Visual Check only.

Table of Contents

Other manuals for GE LOGIQ P9

Related product manuals