EasyManuals Logo

GE LOGIQ P9 Service Manual

GE LOGIQ P9
602 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #463 background imageLoading...
Page #463 background image
GEDRAFT LOGIQ P9/P7
D
IRECTION 5604324, REVISION 11 DRAFT (JANUARY 24, 2019) SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-137
Section 8-25
Replacement of Battery
8-25-1 Manpower
1 person, 1 hour
NOTE: LP9/P7 BUM 5504583 provides the information, "Refreshing the battery" in Chapter 3 Preparing to
System for Use. The recommended procedure can be executed by user for maintaing battery life.
8-25-2 Tools
Standard Phillips Screwdriver.
8-25-3 Removal Procedure
1) Unscrew 12 screws to remove the IO BOX Cover.
Figure 8-160 Screw points of IO BOX cover

Table of Contents

Other manuals for GE LOGIQ P9

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ P9 and is the answer not in the manual?

GE LOGIQ P9 Specifications

General IconGeneral
TypeUltrasound System
3D/4D ImagingYes
ElastographyYes
ConnectivityDICOM, USB, Ethernet, HDMI
Doppler ModesColor Doppler, Power Doppler
Probesconvex, linear, phased array
Imaging ModesM-Mode, Color Doppler, Power Doppler
PortabilityCart-based
ApplicationsVascular, Cardiac, OB/GYN, Musculoskeletal
WeightApprox. 80 kg
Touch Panel10.1-in touchscreen

Related product manuals