EasyManuals Logo

GE LOGIQ P9 Service Manual

GE LOGIQ P9
602 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #479 background imageLoading...
Page #479 background image
GEDRAFT LOGIQ P9/P7
D
IRECTION 5604324, REVISION 11 DRAFT (JANUARY 24, 2019) SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-153
Section 8-30
Replacement of the Probe Holder
8-30-1 Manpower
1 Person, 5 minutes.
8-30-2 Tools
No tool is required.
8-30-3 Removal Procedure
1) Simply pull out Probe Holder from its location.
NOTE: This procedure applies to all locations of probe holder.
Figure 8-180 Removal of Probe Holder
Figure 8-181 Probe Holders
8-30-4 Installation Procedure
Parts to be installed in reverse order of removal.
8-30-5 Functional Check
Visual inspection Only.
Probe holder
4D Probe holder

Table of Contents

Other manuals for GE LOGIQ P9

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ P9 and is the answer not in the manual?

GE LOGIQ P9 Specifications

General IconGeneral
TypeUltrasound System
3D/4D ImagingYes
ElastographyYes
ConnectivityDICOM, USB, Ethernet, HDMI
Doppler ModesColor Doppler, Power Doppler
Probesconvex, linear, phased array
Imaging ModesM-Mode, Color Doppler, Power Doppler
PortabilityCart-based
ApplicationsVascular, Cardiac, OB/GYN, Musculoskeletal
WeightApprox. 80 kg
Touch Panel10.1-in touchscreen

Related product manuals