EasyManuals Logo

GE LOGIQ P9 Service Manual

GE LOGIQ P9
602 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #504 background imageLoading...
Page #504 background image
GERAFT LOGIQ P9/P7
D
IRECTION 5604324, REVISION 11 DRAFT (JANUARY 24, 2019) SERVICE MANUAL
8-178 Section 8-45 - Replacement of battery pack for LP7-P9 R2 ext battery pack
7) Lift up POLARIS BATTERY PACK and disconnect BATTERY Harness from PWA. Then remove
POLARIS BATTERY PACK.
NOTE: Once replacing battery pack, all of battery packs (4 pcs) need to be replaced in same time.
8-45-4 Installation Procedure
NOTE: Once replacing battery pack, all of battery packs (4 pcs) need to be replaced in same time.
All components to be installed in reverse order of removal.
8-45-5 Functional Check
1) Turn on the circuit breaker.
Figure 8-212 Removing POLARIS BATTERY PACKS
Figure 8-213 Turning on circuit breaker

Table of Contents

Other manuals for GE LOGIQ P9

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ P9 and is the answer not in the manual?

GE LOGIQ P9 Specifications

General IconGeneral
TypeUltrasound System
3D/4D ImagingYes
ElastographyYes
ConnectivityDICOM, USB, Ethernet, HDMI
Doppler ModesColor Doppler, Power Doppler
Probesconvex, linear, phased array
Imaging ModesM-Mode, Color Doppler, Power Doppler
PortabilityCart-based
ApplicationsVascular, Cardiac, OB/GYN, Musculoskeletal
WeightApprox. 80 kg
Touch Panel10.1-in touchscreen

Related product manuals