GERAFT LOGIQ P9/P7
D
IRECTION 5604324, REVISION 11 DRAFT (JANUARY 24, 2019) SERVICE MANUAL
8-164 Section 8-37 - Replacement of the Monitor Arm
Section 8-37
Replacement of the Monitor Arm
8-37-1 Manpower
1 person, 15 minutes.
8-37-2 Tools
Standard Phillips Screwdriver, Nipper, 4 mm Hex Wrench, 3 Cable ties (GEPN: 2160955).
8-37-3 Removal Procedure
1) Remove LCD monitor and LCD Arm Plastic Covers.(refer to section 8-11)
2) Remove Harness Cable Assy and Monitor Arm. (refer to section 8-11-4 1)~4))
8-37-4 Installation Procedure
In reverse order of removal.
8-37-5 Functional Check
1) Visually check LCD monitor
2) LCD Arm Test. (Refer to section 4-3-2-2).

Table of Contents

Other manuals for GE LOGIQ P9

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ P9 and is the answer not in the manual?

GE LOGIQ P9 Specifications

General IconGeneral
TypeUltrasound System
3D/4D ImagingYes
ElastographyYes
ConnectivityDICOM, USB, Ethernet, HDMI
Doppler ModesColor Doppler, Power Doppler
Probesconvex, linear, phased array
Imaging ModesM-Mode, Color Doppler, Power Doppler
PortabilityCart-based
ApplicationsVascular, Cardiac, OB/GYN, Musculoskeletal
WeightApprox. 80 kg
Touch Panel10.1-in touchscreen

Related product manuals