EasyManuals Logo

GE LOGIQ P9 Service Manual

GE LOGIQ P9
602 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #478 background imageLoading...
Page #478 background image
GERAFT LOGIQ P9/P7
D
IRECTION 5604324, REVISION 11 DRAFT (JANUARY 24, 2019) SERVICE MANUAL
8-152 Section 8-29 - Replacement of Peripheral Cable Assy
8-29-2-5 Installation Procedure
Parts to be installed in reverse order of removal. But, refer to below procedure for cable ties.
Figure 8-179 Tie cables with the tie through the holes
8-29-2-6 Functional Check
Test 1: Print an image by pressing the button P1 on the operator panel. (P1 key should be configured
correctly. Refer to section 3-8-4 Adding Printer to the system)
Verify1: - Verify that image can be printed.
Verify2: - Verify that printed image has no distortion as compared the image on screen.
2 holes for fixing cable tie
Cable tie
Align the head of cable tie as shown

Table of Contents

Other manuals for GE LOGIQ P9

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ P9 and is the answer not in the manual?

GE LOGIQ P9 Specifications

General IconGeneral
TypeUltrasound System
3D/4D ImagingYes
ElastographyYes
ConnectivityDICOM, USB, Ethernet, HDMI
Doppler ModesColor Doppler, Power Doppler
Probesconvex, linear, phased array
Imaging ModesM-Mode, Color Doppler, Power Doppler
PortabilityCart-based
ApplicationsVascular, Cardiac, OB/GYN, Musculoskeletal
WeightApprox. 80 kg
Touch Panel10.1-in touchscreen

Related product manuals