GEDRAFT LOGIQ P9/P7
D
IRECTION 5604324, REVISION 11 DRAFT (JANUARY 24, 2019) SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-1
Chapter 8
Replacement Procedures
Section 8-1
Overview
8-1-1 Purpose of Chapter 8
This chapter contains replacement procedures for different modules and their subsystems.
!! NOTICE:
The Manpower, time and Tools indicated in the Sub-sections include all requirements from
Preparations to Installation Procedures.
!! WARNING:
No covers or panels should be removed from the system (high-voltage risk).
Service and repairs must only be performed by authorized personal.
Attempting do-it-yourself repairs invalidate warranty and are an infringement to
regulations and are inadmissible acc. to IEC 60601-1.
Energy Control and Power Lockout for LOGIQ P9/P7.
When servicing parts of the system where there is exposure to voltage greater than 30 Volts:
1. Turn off the scanner.
2. Unplug the system.
3. Maintain control of the system power plug.
4. Wait for at least 20 seconds for capacitors to discharge as there are no test points to verify isolation.
Beware that the Power Supply, Front End Processor and Back End Processor may be energized even
if the power is turned off when the cord is still plugged into the AC Outlet.
UT
The Waste of Electrical and Electronic Equipment (WEEE) must not be disposed as unsorted
municipal waste and must be collected separately.
Please contact the manufacturer or other authorized disposal company for information
concerning the decommission of your equipment.
Table 8-1 Chapter 8 Contents
Section Description Page Number
8-1
Overview
8-1
8-2
Warnings and important information
8-5
8-3
System Software - Installation/Upgrade Procedure
8-7
8-4
Software and Functional Checks after Installation Procedure
8-56
8-5
Settings - Backup and Restore
8-57
8-6
Replacement of Front Cover
8-62
8-7
Replacement of Top Cover
8-64
8-8
Replacement of Side Cover
8-66
8-9
Replacement of Rear Cover
8-70