Chapter 8 - Replacement Procedures 8-103
8-17-5 Removal Procedure - Nest Box
NOTE: Before working with Nest box, be sure to remove probes.
1) Remove front cover. (refer to section 8-6)
2) Disconnect 1 fan connector of bottom fan.
3) Unlock cable clamp, then pull out connector and cable of bottom fan. Refer to following figures.
Figure 8-109 Fan Connector
4) Remove 2 screws on front side.
Figure 8-110 Front side screw points
5) Remove the rear cover. (refer to section 8-9)
6) Remove Power cord fix bracket and power cord. (refer to section 8-17)
7) Remove cable cover bracket and disconnect cables. (refer to section 8-17)

Table of Contents

Other manuals for GE LOGIQ P9

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ P9 and is the answer not in the manual?

GE LOGIQ P9 Specifications

General IconGeneral
TypeUltrasound System
3D/4D ImagingYes
ElastographyYes
ConnectivityDICOM, USB, Ethernet, HDMI
Doppler ModesColor Doppler, Power Doppler
Probesconvex, linear, phased array
Imaging ModesM-Mode, Color Doppler, Power Doppler
PortabilityCart-based
ApplicationsVascular, Cardiac, OB/GYN, Musculoskeletal
WeightApprox. 80 kg
Touch Panel10.1-in touchscreen