IRECTION 5604324, REVISION 11 DRAFT (JANUARY 24, 2019) SERVICE MANUAL
8-126 Section 8-22 - Replacement of Caster
6) Remove Nut and replace Caster.
Figure 8-150 Removable Nut of Caster
8-22-4 Installation Procedure
Parts to be installed in reverse order of removal.
NOTE: Hex screws should be tightened.
8-22-5 Functional Check
Visual inspection Only.
CAUTION
!! CAUTION:
Proceed with extreme caution and avoid system tipping over. The system weighs
approximately 60kg.

Table of Contents

Other manuals for GE LOGIQ P9

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ P9 and is the answer not in the manual?

GE LOGIQ P9 Specifications

General IconGeneral
TypeUltrasound System
3D/4D ImagingYes
ElastographyYes
ConnectivityDICOM, USB, Ethernet, HDMI
Doppler ModesColor Doppler, Power Doppler
Probesconvex, linear, phased array
Imaging ModesM-Mode, Color Doppler, Power Doppler
PortabilityCart-based
ApplicationsVascular, Cardiac, OB/GYN, Musculoskeletal
WeightApprox. 80 kg
Touch Panel10.1-in touchscreen