13 Decommissioning, Storage and Transport
13.1 De-commissioning
Follow the instructions in the machine's operator manual.
13.2 Packing
Follow the instructions in the machine's operator manual.
13.3 Storage
Follow the instructions in the machine's operator manual.
13.4 Transporting
Follow the instructions in the machine's operator manual.
13.5 Battery removal and disposal
Precondition SIGMA CONTROL 2 is decommissioned.
1. Disconnect SIGMA CONTROL 2 from all connections.
2. If necessary, use a tool to forcefully remove the rear enclosure panel.
3. If necessary, use a tool to forcefully remove the board from the housing.
4. Use a suitable tool to remove the internally installed battery.
5. Battery disposal in accordance with environmental guidelines.
6. Hand the SIGMA CONTROL 2 over to an authorized disposal expert.
Further information Refer to the machine’s Operating Manual for details regarding the battery’s environmentally sound
disposal.
13 Decommissioning, Storage and Transport
13.1 De-commissioning
No.: 9_9450 13 USE
User Manual Controller
SIGMA CONTROL 2 SCREW FLUID ≥5.1.2
235

Table of Contents

Other manuals for KAESER SIGMA CONTROL 2