17
Keysight E4980A/AL Precision LCR Meter
User’s Guide
1 Unpacking and Preparation
This chapter describes how to set up and start the Keysight E4980A/AL
Precision LCR Meter.
Contents of this Chapter
- Checking the Shipment on page?
After you receive the E4980A/AL, check all the items in the packing container.
- Preparation before Use on page?
Shows how to check the power supply as well as check and connect the power
cable. This section also describes how to deal with a blown fuse.
- How to Remove the Handle on page?
Shows how to attach and remove the handle.
- Environmental Requirements on page?
Describes the system requirements needed to install the E4980A/AL and how to
secure space for heat radiation.
- Starting the E4980A/AL on page?
Describes how to turn on/off the power switch and cut off the power supply.