Preparing the Installation
1.4 Selecting and Preparing a Site for Installation
When selecting an installation location consider the following points:
• The location must be free from vibration, and the inverter must be installed on a wall
that can support the inverter’s weight.
• The inverter can become very hot during operation. Install the inverter on a surface that
is fire-resistant or flame-retardant and with sufficient clearance around the inverter to
allow air to circulate. The illustrations below detail the required installation clearances.