1.29 JAKE BRAKE
On model 760 only, install the ball check valve as follows:
1. Install the ball check valve and spring. See Figure 1-432.
1. Ball Check Valve 3. Pipe Plug
2. Spring
Figure 1-432 Installation of Ball Check Valve
2. Insert the plug. Torque pipe plug to 11.2 N·m (8.3 lb·ft).
All information subject to change without notice.
1-548 From Bulletin 16-60-99 6SE483 9901 Copyright © 1999 DETROIT DIESEL CORPORATION

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the PREVOST LE MIRAGE XLII BUS SHELLS and is the answer not in the manual?

PREVOST LE MIRAGE XLII BUS SHELLS Specifications

General IconGeneral
BrandPREVOST
ModelLE MIRAGE XLII BUS SHELLS
CategoryBuses
LanguageEnglish

Related product manuals