EasyManua.ls Logo

Siemens Rapidlab 1200 - Page 224

Siemens Rapidlab 1200
448 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6-18 Rapidlab 1200 Operator’s Guide: Troubleshooting
02087462 Rev. V
2. Replace the pO
2
sensor with the clot clearing tool.
a. Push the black spring-loaded latch assembly (item 1, Figure 6-4), located at the
right of the 1200 Reference sensor, to the right, until the mechanism clicks in
place.
Figure 6-4 Measurement Module Compartment
b. Remove the pO
2
sensor by lifting the sensor lip (item 2, Figure 6-4) up at the
bottom while pressing the top of the sensor (item 3, Figure 6-4) inward.
1 spring-loaded latch assembly
2 top of the pO
2
sensor
3 lip of pO
2
sensor

Table of Contents

Related product manuals