Operation
9
CCD CAM 100 – Installation and Operating Manual 163/198
After a short waiting time, the Touch screen Calibration menu
appears in the display.
5. Carry out touchscreen calibration (procedure see Calibrating
the Touchscreen, page 164).
After the touchscreen calibration is finished, the Spirit Level
Calibration menu appears in the display.
6. Carry out calibration of the electronic spirit level (procedure
see Calibrating the Electronic Spirit-Level, page 166).
After the calibration is finished, the system is restarted.
After a short waiting time, the operation screen appears in the
display.
7. Switch the CCD camera free of voltage.
8. Switch DIL switch S1.7 to position OFF.
9. Close the service opening cover.
10. Switch on the power supply.
After restoring the factory default settings, it is imperative
that DIL switch S1.7 is returned to the OFF position.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the BST CCD CAM 100 and is the answer not in the manual?

BST CCD CAM 100 Specifications

General IconGeneral
BrandBST
ModelCCD CAM 100
CategoryAccessories
LanguageEnglish

Related product manuals