Preliminary steps
▶
"Locating the defective server" on page
47.
▶
Check which PSU is defective.
PSU is defective when the PSU status indicator lights orange. For more
information, see "Indicator on hot-plug PSU" on page 553.
▶
Only when replacing a PSU in a non-redundant configuration: "Shutting
down the server" on page 50.
▶
Remove the power cord from the defective PSU, see "Disconnecting the
power cord" on page 50.
Removing the defective hot-plug PSU
▶
Remove the PSU, see "Removing a hot-plug PSU" on page 129.
Installing the new hot-plug PSU
▶
Install the PSU, see "Installing a hot-plug PSU" on page 126.
Concluding steps
▶
"Connecting the power cord" on page 65.
▶
Only when replacing a PSU in a non-redundant configuration: "Switching on
the server" on page 71.
▶
"Performing a fan test" on page 117.
A fan test does not need to be performed if the hot-plug PSU is
actively replaced. iRMC runs automatically
.
▶
Check that the PSU status indicator is lit green.
Power supply unit (PSU)
134 Upgrade and Maintenance Manual RX2540 M7